Published PL International Articles
| Article | ID | Written | Published | Notes | More |
| PL Risk Assessment Essential Elements’s | 1 | 3/1/2012 | Essential Elements | ||
| PL Risk Assessment as a measurement tool | 2 | 6/1/2012 | June 2012 | Scores are no longer needed. | outdated methods |
| RA controlling the bias (PXX) | 3 | 9/1/2012 | Sept 2012 | An essential element in risk assessment. | conservatism |
| Risk profiling | 4 | 12/1/2012 | Mar 2012 | An essential starting point for risk mgmt. | QA/QC tools, RM tools |
| Threat Interaction—A Case of Confusing Terminology | 5 | 3/1/2013 | Mar 2013 | Sometimes guidance docs get it wrong. | threat interaction, missteps, guidance, guidance2 |
| Myth Busting—I don’t have enough data | 6.2 | 4/1/2013 | June 2013 | There is always ‘some’ data available. | data myth |
| Myth Busting—I don’t have enough data (Part 2) | 6.3 | 9/1/2013 | Sep 2013 | Let’s not confuse data availability with risk modeling | data myth2 |
| Measuring Failure Potential—What is Attacking? How Effective are Defenses? Can it Survive? | 7 | 11/1/2013 | Dec 2013 | The only way to truly understand failure potential. | basic concepts |
| Formal Risk Assessment—Is it helping me? | 8 | 2/1/2014 | Mar 2014 | Beyond regulatory compliance, risk assessment should be a valued tool. | Special applications |
| Troubles with Weightings | 9 | 6/1/2014 | once thought necessary, these are now recognized as problematic | weightings | |
| Q&A with a PL Risk Expert | 10 | interview | |||
| PL RA as a tool for resolving conflict | 11 | 12/1/2014 | why debate subjectively when you have an objective tool available? | Special applications | |
| Where is the Risk Control Strategy? | 12 | 2/1/2015 | Strategizing may be different from managing. | strategy | |
| Due Diligence | 13 | 4/1/2015 | risk assessment should be a part of any acquisition | diligence | |
| The Economics of Acceptable Risk | 14 | 9/1/2015 | Sept 2015 | How to set target risk levels | acceptable |
| Certification: The Leaning Tree Incident | 15 | 11/1/2015 | Dec 2015 | What does a risk assessment really need to include? | certification blog; gaining certification |
| Damage vs Failure—A Risk Assessment Needs to Know the Difference | 16 | 2/1/2016 | Mar 2016 | An important distinction | damage |
| ILI vs DA—The Risk View | 17 | Apr 2016 | June 2016 | These 2 techniques have very different risk implications | ILI-DA |
| Risk is PoF x CoF—Where Should the Focus Be? | 18 | 7/1/2016 | Sept 2016 | Risk mgmt is often best focused on one side of the equation | beginningRM |
| Updating Guidance Documents for Pipeline | 19 | 10/1/2016 | guidance, guidance2 | ||
| Threat Identification and Risk Assessment | |||||
| Words Matter | 20 | 1/1/2017 | myths1, missteps | ||
| Exciting Times for Pipeline Risk Management | 21 | 5/1/2017 | June 2017 | Being able to do real cost/benefit analyses is a ‘game changer’ | better, cost-benefits |
| Optimizing Inspection Info in a Risk Assessment | 22 | 8/1/2017 | Sept 2017 | How to properly use inspection results in risk assessment | Inspections / Assessments |
| Getting Info From SME’s–Facilitation | 23 | 10/1/2017 | Dec 2017 | Data collection from SME’s | RA tools |
| The Essential Elements | 24 | 2/1/2018 | Mar 2018 | Revisit the basic building blocks of modern risk assessmetn | Essential Elements |
| Analyses of Risk Estimates—How to Begin | 25 | 5/1/2018 | June 2018 | histograms, profiles, QA/QC of risk estimates | RM tools |
| Seduced by Graphics—The Myth of Risk Management by Images | 26 | 7/1/2018 | Fall 2018 | Some attempts to summarize risk cause problems | |
| Avoiding Missteps: Risk vs Rate of Risk | 27 | 10/1/2018 | Winter 2018 | Pipeline segment length can hide important info | |
| Don’t Worry, We Did an ILI | 28 | 3/1/2019 | Mar 2019 | ILI from a risk mgmt perspective | inspections / assessments |
| Life-Cycle Risk Assessment—An HDD Example | 29 | 5/1/2019 | June 2019 | Construction planning benefits from RA. | HDD |
| What are they missing | 30 | 8/1/2019 | Oct 2019 | Some forms of risk assessment are missing key aspects. | old methods |
| A $200 Anomaly Threshold doc ver |
31 | 11/1/2019 | Jan 2020 | Risk cost/benefit is a powerful risk mgmt tool. | 200anom |
| What We Must Know In Order to Understand Your Risk Assessment |
32 | 3/1/2020 | Apr 2020 | PXX: Bias control is an essential element in risk assessment | |
| Risk Reduction via Leak Detection | 33 | Apr-20 | July 2020 | leak detection capability analyses | LDS |